Save the Sound facilitated the preliminary design process for four large-scale green infrastructure projects in downtown Bridgeport. The Bridgeport Water Pollution Control Authority along with project engineers at Arcadis honed in on four sites where green infrastructure could help to disconnect impervious surface from the combined sewer system including sites at Housatonic Community College, on State Street, John Street and in the plaza in front of People's Bank on Main Street.